Hi, assume below scenario:
in a case type, in stage A, below 2 configurations may be used:
(1) Only one process(flow) in it, P1, which include 3 steps, S1, S2 and S3, running in sequence.
(2) Two processes (flows) in it, named P1 and P2, and P2 is set to start after P1. Two steps in P1: S1, S2. One step in P2: S3.
My question is, what's diff btw (1) & (2) in view of their effect? In both, the running sequence are same: S1->S2->S3, thanks.