How to set a parallel process with respect to a step ?
In 7.1.x version had a provision to set a step as parallel using the step configuration. how this can be achived in 7.2.2.
Ex: I am having 6 steps (Step1 , Step2 , Step3 , Step4 , Step5, Step6 ) under a single stage.
& i need Step1->Step2->Step3 as sequance
Step4 need to parallel to Step3 : Step3 || Step4
again step5 || Step6 are parallel
Design:
Step1
Step 2
Step 3 Step4
Step 5 Step6
I tried with "Add Parallel process" next to the respective steps .But it executes when the stage starts not to the particular step.
"Start When" is that a option ? Kindly guide me with Screen shot !