Hi,
We have a requirement to provide an option to user to generate correspondence as part of a flow say XYZ. The Generate Correspondence Flow has TWO screens - one with the list of correspondences and second with some other option provided for user input. (hence it cant be included as a local flow action) Upon submitting the second screen, the Correspondence would be generated.
The expectation then is to route BACK to the initial WB screen post corr generation.
Also, in case of ERROR, we need to create a SEPARATE WL assignment with a different status say 'Pending-ErrorCorr', the main assignment continues.
The user can then work on this error assignment in parallel to the initial XYZ assignment.