[Robotics] Is there a way to automate failover?
What is the proper way to switch to DR for robots?
Currently, we have to manually get into every unattended machine to manually turn off PRD and then log into every DR machine to turn it on.
Is there perhaps a better way to do so? Having over a 100+ bots makes it time consuming, and can take hours when other departments spent less than 30mins for a switch.
Is there perhaps a system on BPM to automate failover for robots? Or some other way?
Thanks!