Closed
Solved
how can you configure a new flow between two already exisiting flows
how can you configure a new flow between two already existing flows(and the flow is not in production ,its a new requirement)? Like after flow A ,flow B was called but now after flow A, flow X should be called.
***Edited by Moderator Marissa to change type from General to Product, added Product details and Capability tags***
To see attachments, please log in.