Question
 
            
       CSAA   
  CSAA
US
   CSAA   
  
          Posted: Sep 6, 2018
        Last activity: Sep 19, 2018
      Last activity: 19 Sep 2018 3:04 EDT
      
        Closed
    
      
 
  
  
  
Create Work Object and Put in WorkList
Hi
I have a requirement to create a work object while already working in another work object and I need to put it in the current operator's worklist. The whole operation should not disturb the existing work object and should happen in the background. Any idea on how to achieve this.
Thanks in Advance
Naveen
***Edited by Moderator Marissa to update platform capability tags****
 
            
    