Hi Subhendu
Yes it is possible to upgrade from PRPC 5.4 to PRPC 7.1.7, Please request the upgrade media from Pegasystems.
you can refer the upgrade guide from the below location.
https://pdn.pega.com/support-resources/deployment-upgrades/deployment-guides
Regards,
Sandeep
Capgemini
IN
Thanks Sandeep.
CBA
AU
Hi Sandeep,
Can you please let me know, how can we estimates the efforts for the upgrade from 5.4 to 7.X.
Infosys Limited
IN
Hi Rohit,
You can use upgrade estimator tool to estimate the total effort required for complaince upgrade.
https://pdn.pega.com/exchange/components/upgrade-estimator-tool
Accenture Technology Services
IN
Upgrade estimator tool is not available for 5.4 applications.
CBA
AU
Hi Sankhadeep,
Is there any other work around for the estimates of application on 5.4 version.
CBA
AU
Hi Supriya,
Thank you for your reply!
However the upgrade estimator tool does not support version 5.4, it supports from version 5.5.
Is there any other way to get the estimates for upgrade from 5.4 to 7.1.9.
Updated: 16 Jan 2020 12:31 EST
One more thing is, only the latest version will be available for download. So, you will be upgrading to 7.2.1
Also, you can take 5.5 as the source and extrapolate some % for 5.4
CBA
AU
Hi Punna,
All our applications is in 5.4 none of them is in 5.5 so we need a way to estimate on the basis of it.
Updated: 16 Jan 2020 12:31 EST
Point is rohit, since you dont have 5.4 in the drop down, you can select 5.5, which is closer to 5.4.
There is not a lot of difference between upgrading from 5.4 to 7.2 vs 5.5 to 7.2. So, take that as a baseline and then add some extra time as the tool gives you 5.5, and yours is 5.4
EvonSys
US
Hello Rohit,
Based on your implementation, some of the functionality will have to be retrofitted. eg : Portals. However these portal changes will be considered as part of the estimator tool.
I recommend that you run the estimator tool with 5.5 as your base version and add a sub category to the sheet for 5.4 changes if there are any.
regards
Arun MS