Question
Cognizant Technology Solutions
GB
Last activity: 20 Dec 2021 7:34 EST
Modifying job scheduler without code deployment
Hello All,
We have recently upgraded to pega 8.5.2 and as pega recommends have used Job scheduler instead of legacy advanced agents. However every time there is a need to change the frequency , it requires a change in the rule. Unlike agent schedules there is no way to update the frequency directly in production without change in the rule.
I have gone through the earlier posts and it seems that only options are
1. Code deployment
2. Save as and modify in higher unlocked ruleset in Production
Is there any better way of doing it ?