How to stop loop run in an activity which is started by JOb scheduler?
There is Job, which has a loop runs as many times as the value mentioned in DSS.
In DSS 5000 number must be given. But by mistake 50000 is given. Now the job is started and running.
It shouls run only for 5000 times. How to stop the loop run. I disabled the job run. but nu luck. Anybody has solution.