Question
Virtusa
AE
Last activity: 10 Aug 2017 10:19 EDT
Date update should be same based on same property value.
Hi All,
A requirement is like this:
Date updated for the activity of one Site should also be reflected in another site’s activity which is linked(Based on LinkID). For the linked sites the activity will run in parallel, hence the same date should be updated for the common activity.
Attached screenshot:
Note: UI is Tree Structure or grilled down and I am performing Data Transform on it.
also was not able to see LinkID on tracer, LinkID is coming up to the only root level.
Your help will be remembered.
Thank you.