Discussion


Cognizant
IN
Last activity: 23 Sep 2015 6:32 EDT
Errors in "Moving To Pega 7" Course
Moving to Pega 7 >> Business benefits of upgrading to Pega 7 >> Transcript
"More of the process configuration and more of the day-to-day action that you might take within a case lifecycle is not done within the case designer."
I belive we should replace "is not done" with "is now done"
Pega academy support team; please verify this and make the correction.


Cognizant
IN
Moving to Pega 7 >> Pega Platform Upgrade >> Generate DDL Utility >> Transcript
"Welcome to Rules DDL Generation Utility. When customers want to apply the schema changes and see them manually, they can run this tool otherwuse Pega automatically generates and applies the DDLl’s generated."
Pega Academy support team; please correct the typo shown above.


Cognizant
IN
Moving to Pega 7 >> Post Upgrade Steps >> Test Your Knowledge >> Quiz number 2
Pega Academy support team; please verify how the question and the explanation provided for choosing "PRPC 6.1" are relevant.
The course indicates PRPC 5.5 is the correct answer; how is this possible when flow actions in PRPC 5.5 can refer a HTML or could have layout directly configured in them.
So, Flow actions that were built in PRPC 5.5 do not require any conversions ???
Moving to Pega 7 >> Post Upgrade Steps >> Test Your Knowledge >> Quiz number 2
Pega Academy support team; please verify how the question and the explanation provided for choosing "PRPC 6.1" are relevant.
The course indicates PRPC 5.5 is the correct answer; how is this possible when flow actions in PRPC 5.5 can refer a HTML or could have layout directly configured in them.
So, Flow actions that were built in PRPC 5.5 do not require any conversions ???



Wipro Ltd
AU
Hi Vignesh,
Question is for Converting Flow Action rule. As you have mention above PRPC 5.5 can only refer HTML (a form with multiple layouts). So PRPC 6.1 and above are simply Include a Section. Thus, no need to convert Flow actions except PRPC 5.5 in the above question.
There is tool available for this. Please run this tool and you will find more clear on this.
DesignerStudio>System>Release>Upgrade>UpgradeTool -> Convert Flow Actions.


Cognizant
IN
My observation was when I choose PRPC 6.1 ; it should say correct answer. Instead its throwing an error thats what I had captured above. Please attempt the particular quiz once you would realise whats wrong with it.


Wipro Ltd
AU
PRPC 6.1 is not correct answer.
Below is the description from Upgrade Tool. Please check the word Pre.
"Lists and converts pre 6.1 version flow actions to make them compatible with 6.1 and higher versions".
So Answer should be PRPC 5.5


Wipro Ltd
AU
Ok Vignesh,
I got the word "built before which version of PRPC ". Yes you are right. There is mistake in the Question.
Thanks
Saikhom


Cognizant
IN
"Pega Academy" kindly respond to this thread.