Jboss EAP 7.0.6 installation for Pega Jboss ear deployment
Hi,
In the install guide Jboss EAP for IBM Db2 "https://pdn.pega.com/documents/pega-731-platform-installation-guide-jboss-redhat-eap-and-ibm-db2-linux-unix-and-windows", under "Setting application deployment parameters", there is a mention of the statement "To use the EAR file when you deploy, add the configuration for the pooled connection factory". We are trying to use standalone.xml and there is no element called <subsystem xmlns=”urn:jboss:domain:messaging-activemq:1.0”>. This element is only found in standalone-full.xml. Does this mean we have to only use standalone-full.xml for Pega ear deployments ? Also, the step is listed as optional and so is it necessary for all ear deployments?