Closed
Name of the Completed assignment is Showing as "Task" after upgrade to 8.6
Hello Everyone,
After upgrading from 7.1 to 8.6, Some of the completed assignment is showing as Task instade of the assignment description. Any one else faced the same issue?
***Edited by Moderator: Pooja Gadige to add capability tag***