Question
EY
IN
Posted: Sep 24, 2020
Last activity: Sep 24, 2020
Last activity: 24 Sep 2020 11:40 EDT
Closed
Enable Job Schedular without manual intervention through another job schedular
I have a requirement where I will have a Job Schedular say JobSchedular_1 that will run at 10 pm and another job schedular say MonitorJobSchedular_1 that will run at 11 pm that will basically check whether JobSchedular_1 had any errors or if it is disabled, if JobSchedular_1 is disabled then MonitorJobSchedular_1 it will enable it.
How do I achieve this?