Best practice of UAT arrangement when multiple developments on Pega 8.6.2
I had separated multiple applications & multiple ruleset on Pega 8.6.2 to develop different projects. Most of contents are related to CDH actions and campaign/data flow run.
Production will only keep single ruleset so I need to merge multiple ruleset into master ruleset in UAT stage.
As I found "merge" will override content by latest version(raised INC) so I would like to know :
---> any idea how to control ruleset version for Pega 8.6.2.?
The situation is
Cannot merge to become single ruleset
Project A run campaign, setup priority of A ruleset higher than master ruleset
But project B cannot run campaign at this moment as its ruleset is lower than other ruleset so empty after campaign run.
So, this case is not UAT concept as cannot test together.